M.Tech Projects guided
2017:
- " Application of ANT Systems in Scheduling Problems “ ( Pranav Tiwari : DD-CIM )
- " Application of Genetic Algorithms in Project Scheduling ( Rohan Maheshwari : DD-CIM )
2016:
- “Application of Genetic Algorithms and a new Genetic Algorithm for Multiple Resources Constrained Project Scheduling” [ Satpal Singh – IEOR ]
2015:
- "Application of Ant System Algorithms in Vehicle Routing Problems " ( Shiva Shukla – IEOR)
- “Application of Genetic Algorithms in Vehicle Routing Problems “ ( Padmaja Thatoi – IEOR )
2014:
- " Portfolio Optimization with Application to Electricity Markets " (J Manish Punjabi – IEOR))
- “Some Recent Applications of Genetic Algorithms in Supply Chain Scheduling “ ( Shrikant Bhavsar – IEOR
2013:
- “Genetic Algorithms: Concepts and Applications in Scheduling” ( Chandra Prakash Pandey – IEOR )
2012:
- "Quantifying the Bullwhip Effect in Supply Chains: Some recent developments" ( Yogesh Valunj – IEOR)
2011:
- "The Capacitated Vehicle Routing Problem - Recent Developments and Analysis of Effects of Parameters" ( Violet Bhattacharya – IEOR )
- One Dimensional Cutting Stock Problems: Some Recent Developments ( Varsha Suralkar - IEOR )
2010:
- “Heuristics in Resource Constrained Project Scheduling” ( Meenarli Sharma – IEOR )
- “Multi-Objective Optimization Using Genetic Algorithms” ( Ashwin Zade - Mech. Engg. Dual Degree Programme in Computer Integrated Manufacturing)
- “Hybrid Genetic Algorithms for Job Shop Scheduling” ( Ashok Kumar Reddy Polu – IEOR)
2009:
- “Capacitated Lot Sizing in Multi-Echelon Inventory Systems” ( Mohammed Jamal – IEOR)
- “Application of Priority Dispatching Rules in Assembly Job Shop” ( Shreya Jain – IEOR )
- “Model Predictive Control: Principles and Applications” ( Lokesh Paliwal – IEOR )
2008:
- "Bayesian Decision Networks: Algorithms and Applications in Mobile Robot Localization" (Vaibhav Pawar - Mech. Engg. Dual Degree Programme in Computer Integrated Manufacturing)
- "Neural Networks for System Identification and Estimation: Principles and Applications" (Naga Satya Narayana Bojja - IEOR)
- "Constraint Directed Scheduling: Concepts and Applications" (A. Nageshwar Sharma - IEOR)
2007:
- "Reinforcement Learning: Applications in Robotics - Mapping and Localization" (Manish Jain - Mech. Engg. Dual Degree Programme in Computer Integrated Manufacturing)
- "Recent Developments in Application of Neural Networks in Combinatorial Optimization" (Ketan Bodas - IEOR)
- "Application of Reinforcement Learning in Multi-stage Production Planning" (B. Krishna Teja - IEOR)
2006:
- "Recent Developments in Multi-Echelon Production-Inventory Control Systems" (Nivesh Kumar)
- "Application of Neural Networks in Statistical Control Charts for Process Quality Control" (Chetan Vikram Mahajan)
- "Application of Neuro-Fuzzy Control in Robotics" (M. Supreet Reddy - Mech. Engg. Dual Degree Programme)
2005:
- "Applications of Neural Networks in Robot Trajectory Planning and Navigation." ( Maulin M. Joshi )
- "Neural Networks for Combinatorial Optimization." ( Bhaskar Rampalli )
2004:
- "Principal Component Analysis and Independent Component Analysis using Neural Networks." ( Hari Vishnu )
- "Fuzzy Neural Networks and Applications in Robot Navigation." ( M.V. Khare - CIM Dual Degree Programme )
2003:
- "Application of Reinforcement Learning to Robot Navigation with Faulty Sensors and Faulty Actuators." ( Inderjeet Singh )
- "Application of Self-Organizing Map Neural Networks to Robot Self-Localization." ( Hemshankar Raval )
2002:
- "Principles and applications of Reinforcement Learning." (Dewangan Kamlesh)
- "Some hybrid systems using concepts of fuzzy systems and neural networks." (Patil Vijay C.)
- "Application of neural networks in robot control." (Swarup Anant - CIM Dual Degree Programme )
- "Neural networks for optimization of scheduling and combinatorial applications." (Sujan Sreeram N.)
2001:
- "Hopfield Net, Boltzmann Machine and related neural networks for optimization applications."(Krishna Mohan K.)
- "Self Organizing Neural Network application to VLSI circuit placement." (Gahlot Kiran Kumar)
- "Associative Memory and related neural networks: application in Group Technology." (Mangalvedkar Amit M.)
- "Optimization, expert system and neural network approaches to real time scheduling of a robot." (Thomas Reuben - CIM Dual Degree Programme )
- "Artificial intelligence, optimization and neural net techniques for AGV path layout & operational routing control problems." (Gupta Vivek - CIM Dual Degree Programme )
2000:
- "Object Oriented Simulation in flexible manufacturing systems with Automated Guided Vehicles." (Joshi Sameer G.)
1999:
- "Strategies for stock allocation decisions in production-distribution systems." (Satyanarayana K.)
- "Finite Forward Scheduling in multistage production inventory systems: Concepts and applications." (Saxena Pranav)
- "A study of Section scheduling in railways." ( sponsored by Tata Infotech ). [Ashok Kumar Jha] ( coguided with prof. Narayan Rangaraj )
- "Optimal deployment of Work In Process inventories in manufacturing systems." (Veerraghavan Senthil Kumar) ( Mech. Engg. Dual Degree Programme )
1998:
- "Object oriented Simulation of Flexible Manufacturing Systems." (Kannappan S.)
- "Some operational problems of inventory in distribution systems in supply chain management." (Rao V. Srinivasa)
1997:
- "Policies for closed loop control of loading items at a bottleneck facility in a refrigerator manufacturing plant." [ Sponsored by Godrej & Boyce.] (Paranjape Vinayak D) [ coguided with Prof. Narayan Rangaraj ]
- "Systems for planning for materials availability and control of production flows for JIT production." (Alok Kumar) [ coguided with Prof Narayan Rangaraj ]
1996:
- "Flow control in data communication networks." (Joshi Aniruddha)
- "Simultaneous scheduling of machines and Automated Guided Vehicles in an Flexible Manufacturing System." (Kamat Jitendra K.)
- "Some integration problems in JIT manufacturing." (Kharde B.R.) [ coguided with Prof. Karuna Jain - SOM. ]
- "Lean manufacturing: Planning and scheduling for integration of PUSH and PULL concepts." ( Sponsored by Siemens Switchgear Plant ) (Krishnamurthy Anant) [ V Yr. Integrated M.Tech program, Mech. Engg. ]
- "Business Process Re-engineering, emphasizing Production Flow Control." ( sponsored by Siemens Switchgear Plant ) (Talim Virendra M.)[ V Yr. Integrated M.Tech. program, Mech. Engg.]
- "MRP systems with random yields and finite forward scheduling: A case study in a refrigerator manufacturing plant." [ Sponsored by Godrej & Boyce ] (Tivare Girish B.)
1995:
- "Multi-stage batch sizing with joint setup costs, with an application to steel industry." [ Sponsord by Mukand Iron & Steel ] (Agre Rajendra S.) [ coguided with Prof. Narayan Rangaraj ]
- "A Knowledgebased dynamic job shop scheduling system." (Saraph Prasad V.)
1994:
- "Educational test package for uncapacitated multi-stage dynamic lot sizing in MRP systems." (Sriram N.)
- "Development of an educational test package for single facility capacitatd dynamic lot scheduling." (Ventkatraman S.)
- "Design of closed loop MRP and related systems," (Kulkarni Sameer S.)
1993:
- "JIT-Kanban systems and their variants." (Singh Devendra)
- "A flow optimization model of an FMS considering queuing control and optimal routeing." (Balasubramanian V.I.)
- "Production planning and scheduling in Flexible Assembly Systems." (Swamy Shivakumar - M.Tech Production Engg specialization, Mech. Engg )
- "Order batching policies for automated storage and retrieval systems (AS/RS)." (Singh Kamalakar K.)
- "Simulation of a Sequencing Rule for Job Shop Scheduling and implementation in a dynamic environment." [ Sponsored by Guest Keen & Williams - Toolroom Division ] (Dashore Alok)
- "Modelling, analysis and simulation of Flexible Free-Flow assembly system." [ Sponsored by Crompton Greaves ] (Pillai Vinod)
1992:
- "Safety stocks in MRP systems with internal and external uncertainties." (Venkatesh R.)
1991:
- "Management of spare stocks: multi-echelon inventory model for repairable items with emergency lateral shipments and finite number of servers." (Chavan Vineet Singh) [ V Yr. Integrated M.tech. - Mech. Engg. ]
- "Scheduling of Flexible Manufacturing Systems - Two new dynamic dispatching rules and modifications of dispatching rules by look-ahead and look-back." (Neeraj Kumar Agarwal)
- "Inventory control for production distribution systems." (Gupta Purushottam Lal)
- "Planning and control in dynamic Kanban systems." (Abnave S.)
1989 M.S. [ at Ind. Engg. & Mgmt. Division at A.I.T, Bangkok, Thailand.]
- "Planning product mix, Machine loading and Scheduling in multi-stage production of Wire Ropes." [ sponsored by an USHA-SIAM Group company, Bangkok.] (Dechawongsuwan Sukhum)
- "Hierarchical planning of production, Machine loading and Cyclic Scheduling in a polyester making plant." [ sponsored by a Japanese-Thai company ]. (Cheung S.Y.)
- "Buffer stocks in MRP and related systems." (Thevalingam K.)
- "Group Technology and scheduling in multi-stage production." (Chiu Anthony S.F.)
- "Production planning model for an asbestos-cement sheet making factory." ( sponsored by a Thai company ). (Aroon L.) [ coguided with Prof. Mario T. Tabucanon ]
- "Control of flow of bobbins and dynamic scheduling of multi-stage production of wire ropes." ( sponsored by an USHA-SIAM Group company, Bangkok, Thailand. ] (Yenradee Pisal) [ coguided with Prof. Dirk Van Oudheusden ]
1988 M .S. [ at I.E. & M. Div., A.I.T. Bangkok ]
- "A study of line balancing and sequencing of a multiple product assembly line." (See, Chou Shon)
- "Allocation of inspection effort in quality control in multi-stage production." (Vanuptikul, Bhavin)
- "Production-Inventory control of items manufactured on a common machine under stochastic demand." (Chen, Chih Yung) [ coguided with Dr. Van Frausum ]
- "Demand forecasting for a wire rope manufacturing plant." (Taladua N.C.)
- "Control charts and quality-related statistical applications in industry." (Tesara B.B.)
- "Preventive maintenance scheduling." (Edirisinghe K.N.) [ coguided with Prof. Okitsugu Fujiwara ]
1987 ( M.Tech. - IEOR, IITB):
- "Spare parts management: for Repairable items in a multi-echelon system." (Khaire A.N.) [ coguided with Prof. R.C. Chaturvedi ]
1986:
- "A case study in production planning and inventory control." ( sponsored by a company making injection moulded parts. ] (Kolhe A.) [ coguided with Prof. R. C. Chaturvedi ]
1985:
- "Computerization of materials management systems: An MIS development case study." ( Sponsored by Guest Keen Williams - Fasteners Division. ] (Agrawal M.K.) [ coguided with prof. R.C. Chaturvedi ]
1984:
- "Control of Work-In-Progress Inventories in a Long Cycle Job Shop." ( sponsored by Larsen & Toubro ) (Joshi S,D.) [ coguided with Dr. Hirjee Nagarwalla ]
- "Planning and control of production flows and Work In Process in assembly." (Khare P.R.)
- "Effect of cell layout on production flows, WIP and throughput times." (Chakravarthy N.S.)
1983:
- "Computer applications in project management." (Taparia R.K.)
- "Some Operations Research techniques in distribution and materials planning." (Lele U.W.,)
- "Operations Research application in financial management." (Velankar M.S.)
1982:
- "Project scheduling and control - computer software development." [ Sponsored by Larsen & Toubro, Projects Division ] ( Jambusaria P.B. )
- "GERT analysis of quality control plans." (Joshi M.A.)
- "Control of throughput time of material through a receipt stores in a large plant." [ Sponsored by Larsen & Toubro, Switchgear Div. ] ( Gandhi H.V. )
- "Project management - A post-facto analysis for avoidable delays in a completed project." (Eswar V.) [ Sponsored by Larsen & Toubro, Switchgear Div. ]
- "Application of Flow Shop scheduling techniques." [ sponsored by Asian Paints ] ( Sriram P. ) [ coguided with Prof. S. Somasundaram ]
1981:
- "Computerised approaches in production planning: A case study in a motors manufacturing shop." [ Sonsored by Crompton Greaves ] ( Sahni V.P. )
- "Computer applications in materials management: A case study in a steel making plant." [ Sponsored by Mukand Iron & Steel, Kalwe Plant ] ( Shah S.R. )
- "Materials handling systems capacity planning: A case study." [ Sponsored by Mukand Iron & Steel, Kalwe Plant ] ( Satyanarayana G. ) [ coguided with Prof. R.C. Chaturvedi ]
- "Economic Quality Control in continuous production." ( a case study for Rallys' Fan Factory ) ( Rajgopal G. ) [ coguided with prof. M.N. Gopalan ]
1980:
- "Development of computer programs for multiple time series forecasting." (Kabadi S.N.)
- "Develpment of computer programs for integer programming." (Markale R.V.)
- "Development of computer programs for multi-objective linear programming." (Borkar G.S.) [ coguided with Prof. M.N. Vartak ]
- "Production planning in a moulding shop." [ Sponsored by an Injection Moulding company, Lucknow ] ( Trivedi S.K. ) [ coguided with Prof. R.C. Chaturvedi ]
- "Multivariate statistical analysis in marketing and finance." (Sridharan P.)
- "Applications of O.R. in advertising strategy and in marketing strategy." (Hirani M.G.) [ coguided with Prof. L.M. Bhole ]
- "Economic quality assurance in multi-stage production and A case study." [ Sponsored by Forbes, Forbes & Campbell, Chandivali Plant ] ( Joshi S.S. ) [ coguided with Prof. M.N. Gopalan ]
1979:
- "Application of optimization techniques to project scheduling with resource constraints." [ A case study for Mazgaon Docks ] ( Gandhi S.R. )
- "Application of Mathematical Programming in steel industry." (Chandramouli R.)
- "Application of optimization techniques to traffic signal settings." (Deo Rajiv B.)
- "On large scale linear programming with applications to a fire-brick making plant." [ for ACC Ltd. ] (Laxman S.)
- "Opportunistic maintenance strategies." [ sponsored by BEST, Bombay ] (Khot C.M. ) [ coguided with Prof. M.N. Gopalan ]
1978:
- "Truck delivery problems and application." [ sponsored by Indian Oil Corpn. ] ( Raju C.R. )
- "Control of work-in-progress inventories." [ A case study for Premier Automobiles Ltd. ] ( Sharma S.K. )
- "Some scheduling problems in process industries." [ A case study for Asian Paints Ltd. ] ( Pathak S.N. )
1976-77:
- "Heuristic & enumerative methods for the general M/N Job Shop scheduling and a new procedure for the case with alternative machine requirements." (Pandya S.R. - M.Tech Production specialization, Mech. Engg.)
- "Exponential smoothing and Box-Jenkins approaches for forecasting." (Desai S.N. - M.Tech Production Engg specialization, Mech. Engg. )
B.TECH [ MECH. ENGG.] Projects Guided
- 2008:
- "Boltzmann Machines: Principles and Applications in Time Series Forecasting" (Satendra Kumar)
- "Blind Source Separation: Principles and Applications" (Neeraj Gupta)
2007:
- "Intelligent Agents in Supply Chain Management" (Narendra Sharma)
2005:
- "Constraint Satisfaction Problem: Mathematical Programming and AI based Approaches." ( Vivek Ramamurthy )
- "Neural Networks in System Identification and Control." ( Prashant Sheketkar )
2004:
- "Neural Networks for Principal Component Analysis and Independent Component Analysis." ( Abhinav Verma )
- "Dynamically Driven Recurrent Neural Networks and their Applications." (Rineet Ratnakar )
2003:
- "Reinforcement Learning: Principles and Applications." ( Ankit Jain )
- "Self-Organizing Map and its Application to Colour Image Segmentation." (Pramod Kumar)
2002:
- "Neural networks for combinatorial optimization: principles and applications." (Gupta Shobhit)
- "Neural networks for control applications." (Ambekar Rohit)
2001:
- "Principles and applications of ART neural networks in Group Technology and other manufacturing problems." (Mishra Nishant)
- "Principles of Hopfield networks and applications in manufacturing and related problems." (Gupta Ankur)
- "Principles and methods in computer aided assembly planning; and some applications using LISP." (Jain Ashish)
1999:
- "Principles and strategies for controlling inventories in supply chains." (Bagga Jaspreet Singh)
- "Principles of Query languages and applications in MRP type systems." (Arora Gurjeet Singh)
- "Principles of database design and applications in MRP type systems." (Kaushik Saket)
1998:
- "Application of dynamic control rules in materials handling systems in manufacturing." (Jyoti Manish)
1997:
- "Development of an Object Oriented simulation model of an assembly job shop in C++." (Sharma Deepak)
- "Applications of neural networks in manufacturing planning and control: Application of Hopfield network for solving TSP." (Oke Mayuresh Y.)
- "Application of AI methods to scheduling problems - Application of simulated annealing to problems of machine-tending robots/operators." (Dubey Abhijit)
1996:
- "Simulation of strategies for safety stocks determination in MRP systems for a minimum service level of delivery assurance." (Adhya Nilanjan)
- "Object oriented simulation of an MRP system with emphasis on rescheduling." (Nimgaonkar Shirish)
- "Simulation of adaptive and dynamic scheduling strategies in a dedicated FMS." (Seshadri L.)
1995:
- "Real time scheduling in FMS: Simultaneous scheduling of machines and AGVs." (Desai Paritosh)
1994:
- "Computer modelling of some MRP processes: production planning with and without capacity limitations." (Venkatraman S.)
- "Computer modelling of some MRP processes: dispatching feedback and adjusting the Master Production Schedule." (Doshi Bhavin J.)
1993:
- "Scheduling of tasks for robots in FMS's." (Kulkari Atin B.)
- "Operational control policies for AGV's in FMS." (Sanghi Deepak)
- "Dynamic modelling of operational policies in JIT Kanban systems." (Naphade Kedar S.)
- "Modelling and numerical solution of equilibria in transport and commodity flow networks." (Prabhu Sunil S.) [ co-guided with Prof. Narayan Rangaraj ]
1992:
- "Loading, routing and dispatching rules ( heuristics ) in FMS's." (Pariawala Hemant A.)
- "Scheduling in Flexible flow-Shops and assembly shops." (Dixit Parag M.)
1991:
- "Modelling and analysis of a pull based manufacturing system." (Sah Rajesh K.)
- "Determination of safety stocks in MRP systems." (Deshpande Vinayak V.)
1990:
- "Facilities layout: a study concerning conversion of dual graph to block layout." (Heda Bhushan)
- "Optimal replacement and maintenance policies." (Chakraborty Rajesh)
1987:
- "Design and control of Flexible Manufacturing Systems." (Natu M.G.)
- "Buffer stocks in manufacturing systems." (Rao Uday)
1986:
- "Lot sizing under probabilistic demand on a single facility." (Shah J.M.)
- "Lot sizing in multi-stage production: heuristic approaches." (Kochikar V.P.)
- "Production planning problems in Flexible Manufacturing Systems." (Mahabaleshwarkar S.V.)
1985:
- "Hierarchical Production Planning." (Amin Kaushik)
- "Group Technology with emphasis on production flow analysis." (Bidikar V.)
1984:
- "Analysis of bottlenecks in material flow systems." (Dhamankar S.Y.)
1983:
- "Computer applications in purchasing systems." (Kocher B.S.)
- "Management of inventory in distribution systems." (Karmarkar S.N.)
- "Fault tree analysis and some other techniques in determining system reliability." (Ingle J.)
1982:
- "Approaches for group formation in Group technology." (Tamaskar M.)
- "Modern techniques in plant layout." (Choubal S.N.)
1981:
- "Market research with particular reference to statistical methods." (Kulkarni G.M.)
- "Replacement and overhaul decisions: probabilistic and economic analysis." (Veermany S.)
- "Applications of O.R. in cash management." (Velankar M.S.)
1980:
- "Cost optimization models in statistical quality control." (Krishnamurthy R.)
- "Application of multivariate statistics in marketing." (Swaminathan R.)
- "Input-Output Analysis of an economy." (Mitra A.K.) [ coguided with DR. Vemuri ]
- "Capital budgeting under risk." (Mehta M.R.) [ coguided with Prof. L.M. Bhole ]
1979:
- "Stochastic modelling and simulation of a solar water heating system." (Iyer S.N.) [ coguided with Prof. S.P. Sukhatme ]
- "An electric analogue device for project scheduling." (Kalsi P.S) [ coguided with Prof. H.S. Shankar, E.E. DEpt. ]
- "Application of operations research to financial decisions." (Mukundan S.)
1978:
- "Branch and Bound techniques for warehouse location." (Tipnis S.K.)
- "An inventory control simulation for medicines at I.I.T. Hospital." (Bhargva S.)
- "Applying mathematical programming to process planning in steel making." (Bondre S.S)
1976-77:
- "Multi-item lot size scheduling - A case study in an automobile plant." (Kak R.)
- "Flow shop scheduling - and applications in textile industry." (Vangal R.V.)
- "Single and mixed model assembly line balancing." (Phatak M.D.)
Courses Taught
- 2017-18:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
2016-17:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
2015-16:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
2014-15:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
2013-14:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
2012-13:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
2011-12:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
2010-11:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
2009-10:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
2008-09:
- IE651: Inventory Planning and Management Systems
- IE645: Industrial Scheduling
- ME407: Industrial Engg. & Operations Research - I[ 1/2 ]
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
2007-08:
- IE703: Knowledge-based Systems and Applications
- IE702: Neural Networks and Fuzzy Systems
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
2006-07:
- IE703: Knowledge-based Systems and Applications
- IE702: Neural Networks and Fuzzy Systems
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
- IE651: Inventory Planning and Management Systems
- IE647:Applied Integer Programming
2005-06:
- IE703: Knowledge-based Systems and Applications
- IE702: Neural Networks and Fuzzy Systems
- ME409:Intelligent Manufacturing Systems Lab. [ 1/3]
- IE651: Inventory Planning and Management Systems
- ME732:Selected Applications of A.I. and O.R. in Manufacturing Systems
2004-05:
- IE703: Knowledge-based Systems and Applications
- IE702: Neural Networks and Fuzzy Systems
- IE408:Industrial Engg. & Operations Research -II [ 1/2 ]
- IE651: Inventory Planning and Management Systems
2003-04:
- IE681: Computational Lab. In O.O.P. and Simulation
- IE702: Neural Networks and Fuzzy Systems
- IE645:Industrial Scheduling
2002-03:
- IE681: Computational Lab. In O.O.P. and Simulation
- IE702: Neural Networks and Fuzzy Systems
- IE651:Inventory Planning and Management Systems
2001-02:
- IE681: Computational Lab. In O.O.P. and Simulation
- ME722:Analysis and Control in Flexible Manufacturing Systems [ 1/2 ]
- IE645:Industrial Scheduling
- ME630:Knowledge-based Systems in Manufacturing
2000-01:
- IE681: Computational Lab. In O.O.P. and Simulation
- ME722:Analysis and Control in Flexible Manufacturing Systems [ 1/2 ]
- IE651: Inventory Planning and Management Systems
- ME630:Knowledge-based Systems in Manufacturing
- IE682:Computational Lab. in Database & Knowledge-based Systems[ 1/2 ]
1999-00:
- IE681: Computational Lab. In O.O.P. and Simulation
- ME722:Analysis and Control in Flexible Manufacturing Systems [ 1/2 ]
- IE652: Inventory Planning and Management Systems
- ME630:Knowledge-based Systems in Manufacturing
- IE682:Computational Lab. in Database & Knowledge-based Systems[ 1/2 ]
- IE645:Industrial Scheduling
1998-99:
- IE681: Computational Lab. In O.O.P. and Simulation
- ME722:Analysis and Control in Flexible Manufacturing Systems [ 1/2 ]
- IE652: Inventory Planning and Management Systems
- IE682:Computational Lab. in Database & Knowledge-based Systems[ 1/2 ]
- IE645:Industrial Scheduling
1997-98:
- IE693: Computational Lab in I.E. & O.R.
- ME722:Analysis and Control in Flexible Manufacturing Systems [ 1/2 ]
- IE652: Inventory Planning and Management Systems
- IE682:Computational Lab. in Database & Knowledge-based Systems[ 1/2 ]
- IE645:Industrial Scheduling
1996-97:
- IE693: Computational Lab in I.E. & O.R.
- IE694:Computational Lab. in Database & Knowledge-based Systems
- IE652: Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1995-96:
- IE693: Computational Lab in I.E. & O.R.
- IE694:Computational Lab. in Database & Knowledge-based Systems
- IE652: Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1994-95:
- IE693: Computational Lab in I.E. & O.R.
- IE694:Computational Lab. in Database & Knowledge-based Systems
- IE652: Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1993-94:
- IE640:Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1992-93:
- IE640:Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1991-92:
- IE640:Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
1990-91:
- IE640:Inventory Planning and Management Systems
- IE650:Modeling and Optimization in Flexible Manufacturing Systems
- IE645:Industrial Scheduling
- IE636: Facilities Planning
1989-90:
- IE641: Network Models and Applications
- IE637:Selected Applications of O.R. in Industries
- IE645:Industrial Scheduling
- IM606:Operations Management
- ME408:Industrial Engg. & Operations Research -II [1/4]
1988-89: [ At Asian Institute of Technology, Bangkok ]
- IE75: Maintenance Management
- IE78:Advanced Production Management
- IE98:Selected Topics in Operations Management
- IE74:Materials Management
1987-88: [ At Asian Institute of Technology, Bangkok ]
- IE43:Stochastic Models
- IE78:Advanced Production Management
- IE71: Production Management
- IE72:Quality Engineering and Management
1986-87:
- ME4401:Production Engineering III [1/2]
- IM606:Operations Management
- IE645:Industrial Scheduling
1985-86:
- ME4401:Production Engineering III [1/2]
- IE640: Inventory Planning and Forecasting
- ME689:Methods Engineering
- IE637:Selected Applications of O.R. in Industries
1984-85:
- ME4401:Production Engineering III [1/2]
- IE645: Industrial Scheduling
- ME501:Industrial Engineering [ 1/2 ]
- IM606:Operations Management
- IE801:Queuing Theory and Applications
1983-84:
- IE640: Inventory Planning and Forecasting
- ME689:Methods Engineering
- ME501:Industrial Engineering [ 1/2 ]
- IE637:Selected Applications of O.R. in Industries
1982-83:
- IE646:Quality, Reliability and Maintenance
- IE645: Industrial Scheduling
- IE641: Network Models and Applications
- IM606:Operations Management
- IE691:Applied Time Series Analysis
1981-82:
- IM609: Marketing Research
- IE636:Facilities Planning
- ME501:Industrial Engineering [ 1/2 ]
- IE640:Inventory Planning and Forecasting
1980-81:
- IE646:Quality, Reliability and Maintenance
- IE601:Quantitative Methods of Managerial Decisions
- IE801: Queuing Theory and Applications
- IM606:Operations Management
- ME689:Methods Engineering
1979-80:
- MA628: Design and Analysis of Experiments
- IE641:Network Models and Applications
- ME689:Methods Engineering
- IE648:Quantitative Analysis in Finance and Marketing
1978-79:
- IE643: Digital Systems Simulation
- ME501:Industrial Engineering
- ME524:Production Management [1/2 ]
- ME689:Methods Engineering
- IE636:Facilities Planning
- IE647:Applied Integer Programming
1977-78:
- IE635: Information Flow Systems
- ME501:Industrial Engineering
- ME689:Methods Engineering
- IE637:Selected Applications of O.R. in Industries
- IE646:Quality, Reliability and Maintenance
1976-77:
- IE641: Network Models and Applications
- ME501:Industrial Engineering
- ME689:Methods Engineering
- IE637:Selected Applications of O.R. in Industries
- IE636:Facilities Planning
1976: Spring
- ME688: Production Planning and Control
- ME524:Production Management [ 1/2 ]
1974: Spring
- OR9370: Introduction to Statistics [ taught at Cornell Univ – O.R. Dept ]