Skip to main content

M.Tech. Project Presentations, October 2015

M.Tech. Thesis Stage-1 Presentations (October 2015)

All interested are cordially invited.

Name Advisor Examiner Title Time and Date Venue
Raghvendr Omer AM VN Developing a Fast and Robust Convex Quadratic Programming Solver 2:45 PM, 21/10 LT 204
Akash Omer ASB JV Pricing strategies for technology consulting projects in enterprise management 2:30 PM, 26/10 Bernoulli, ME
Asheesh Kumar Dubey MR, Prof. Patil VK Modeling of unsignalised intersection with autonomous vehicles

10.30 AM

28/10

Euler, ME
Ujjwal Dixit PGA AM Applications of column generation approaches in scheduling problems    
Chetan Sharma JV NR Mixed Integer Linear Programming model for Rake Scheduling in Aluminium Supply Chain 10:30 AM, 29/10 Bernoulli, ME
Shinde Nimita Rajendra VN AM MINLP solution to Facility Location Problem 2 PM, 21/10 LT 204
Sanjeev Vijendra Irny VK NH Server Selection in Two Time Scales 2.45 PM,
26/10
Archimedes, ME
Kulkarni Pooja Rajendra JV PGA Hybrid Simulation and Optimization Approach to the Job Shop Scheduling Problem 10 AM, 21/10 Archimedes, ME
Anirban Nag AM NR Exact Methods for Finding Optimal Schedules of New Trains in a Railway Network 12 PM, 26/10 ME 205
Anshika Chaurasia NH MR Key Player Problem in Social Networks
 
10 AM, 23/10 Darcy, ME
Jafeer.H MR VK Learning in Large Scale MDP with Applications to Trade Execution and Stock Price Prediction

9.45 AM

28/10

Euler, ME
Rakesh Kumar Sharma NR JV Managing Freight Traffic on Rail Networks: Analysis of Terminal Operations 9:30 AM, 29/10 Bernoulli, ME
Kalpande Abhijeet Ganesh NR VK Root Cause Failure Diagnosis and Data Analysis of Vehicle Performance Data 3 PM, 23/10 Carnot, ME
Anuji C ASB PGA Managing Technology Consulting Projects using Multiple Metrics 10 AM, 28/10 Archimedes, ME
Prateek Dahale AM VN Heuristics for Solving Discrete Optimization Problems 4:45 PM, 23/10 Darcy, ME
Rishikesh Kushwaha AM VN Cutting Plane Algorithms: Development and Implementation 4 PM, 23/10 Darcy, ME
Satpal Singh PGA JV Application of Genetic Algorithms in Project Scheduling Problems 11:30 AM, 26/10 Archimedes, ME
Yogesh Nailwal VK MR Polling Systems: Sufficiency of Priority Schedulers 4 PM, 23/10 Carnot, ME
Augustin Tete PGA MR Application of Ant Algorithm on Resource Constrained Project Scheduling Problem 3 PM, 23/10 Archimedes, ME
Neeraj Sinha ASB NH Product Reliability Management of 'Earth
Leakage Circuit Breakers' using Life Cycle Approach
11AM, 28/10 Archimedes, ME

Instructions for Candidates:

  • Please email amahajan@iitb.ac.in and jafeerh@iitb.ac.in for updating the title, scheduled time and venue or other details. We will update the details as and when we receive them.
  • Please bring a print-out of the evaluation form and the feedback form at the time of your presentation.
  • The evaluation form should be submitted in the IEOR office after the examination.
anirban_nag

Please try to update my presentation schedule at least 12 hours prior to the scheduled time

Fri, 10/23/2015 - 12:26 Permalink